TM 9-2330-238-14
5-16. TANDEM SUSPENSION
BRACKET REPLACEMENT
(Cont).
2.
Install six new rivets (3) and four new rivets (4) or new bolts and new locknuts in tandem suspension
bracket (1)
and framerail
(2).
3.
Position bogie assembly
under semitrailer. Install six screws, new Iockwashers,
and nuts on each end of axle
and bracket assembly
and tandem suspension
brackets
(1) (para 5-6).
4.
Remove jackstands
from rear of semitrailer
and lower semitrailer.
5.
Install hydraulic
lines to connection
on bases of tandem axle (para 4-42).
5-47