TM 9-2330-238-14
5-11. LANDING
GEAR MAINTENANCE
(EARLY MODEL) (Cont).
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Remove two capscrews
(45) and self-locking
nuts (43) from intermediate
drive shafts (16) on each side of
actuating
leg assembly
(12). Discard self-locking
nuts.
Remove six nuts (21), Iockwashers
(20), two spacers (19), and six capscrews
(42) from support leg bracket (37)
and frame. Discard
lockwashers.
Slide support
leg assembly
(26), support leg bracket
(37), and intermediate
drive shaft (16) away from frame
until intermediate
drive shaft clears hole in frame and cross tube assembly
(36) is disengaged.
Remove cross tube assembly
(36) and two lower braces (25). Remove lower braces from ends of cross tube
assembly.
Repeat steps 14 and 15 for remaining
support leg assembly
(26).
Remove two nuts (15), Iockwashers
(14), and capscrews (13)
from forward end of actuating
leg assembly (12)
and frame crossmember.
Discard
lockwashers.
Lower actuating
leg assembly
(12) until drive shaft (44) is clear of frame crossmember
and remove
from
semitrailer.
Remove
two sleeve
bearings
(46) and separate
upper brace (18) from semitrailer
bracket
(2).
Remove two lubrication
fittings (47) from semitrail-
er bracket
(2). Discard
lubrication
fittings.
Remove
sleeve
bearing
(51) from upper
brace
(18).
Remove
lubrication
fitting
(50) from brace hinge
pin (24). Discard
lubrication
fitting.
Remove
two
sleeve
bearings
(48) from
lower
brace (25).
Remove
lubrication
fitting (49) from lower brace
(25). Discard
lubrications
fitting.
Repeat steps 20-25 for semitrailer
bracket (2) and
upper and lower braces (18 and 25) on other side.
5-22
