• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Bowl Up Solenoid.
Figure 8. Bowl Up Solenoid.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  1090    1091    1092    1093    1094  1095  1096    1097    1098    1099    1100  
img
.
TM 5-3805-296-23-6
0436
REMOVAL CONTINUED
NOTE
Note location of O-rings to aid in installation.
9. Remove two small O-rings (Figure 7, Item 1) from bowl up solenoid (Figure 7, Item 2). Discard O-rings.
10. Remove large O-ring (Figure 7, Item 3) from bowl up solenoid (Figure 7, Item 2). Discard O-ring.
Figure 7. O-rings.
0436
END OF TASK
CLEANING AND INSPECTION
000436
1. Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0539).
2. Clean and inspect all components IAW Electrical General Maintenance Instructions (WP 0540).
END OF TASK
INSTALLATION
000436
NOTE
Install O-rings as noted during removal.
1. Install new large O-ring (Figure 7, Item 3) on bowl up solenoid (Figure 7, Item 2).
2. Install two new small O-rings (Figure 7, Item 1) on bowl up solenoid (Figure 7, Item 2).
0436-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.