TM 5-3805-296-23-6
0422
REMOVAL CONTINUED
27. With assistance, use lifting device (Figure 9, Item 2) to move ejector (Figure 9, Item 3) towards front of
machine. When upper roller (Figure 9, Item 1) is past track end (Figure 9, Item 6) and lower roller
(Figure 9, Item 5) is past track end (Figure 9, Item 4), remove ejector from machine.
28. With assistance, use lifting device (Figure 9, Item 2) to lower ejector (Figure 9, Item 3) to flat level surface.
Figure 9. Upper and Rear Roller Tracks.
0422
29. Relieve tension from chain hoist (Figure 10, Item 3).
30. With assistance, remove nylon sling (Figure 10, Item 4) from rear ejector frame (Figure 10, Item 5) and chain
hoist (Figure 10, Item 3).
31. Remove chain hoist (Figure 10, Item 3) from lifting device (Figure 10, Item 2).
32. Remove lifting device (Figure 10, Item 2) from ejector (Figure 10, Item 1).
Figure 10. Ejector.
0422