• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Ground Level Shutdown Switch.
Figure 28. Blackout Light Wiring Harness.

Field Maintenance Manual For Military 621G Scraper -6 Page Navigation
  126    127    128    129    130  131  132    133    134    135    136  
img
TM 5-3805-296-23-6
0385
ASSEMBLY CONTINUED
NOTE
Install tiedown straps as noted during removal.
12. Install ladder bracket (Figure 28, Item 11), washer (Figure 28, Item 13), and bolt (Figure 28, Item 12) on front
hood support (Figure 28, Item 1).
13. Install new tiedown strap (Figure 28, Item 10) on blackout wiring harness (Figure 28, Item 9).
14. Install connector bracket (Figure 28, Item 5), ladder bracket (Figure 28, Item 2), washer (Figure 28, Item 3),
and bolt (Figure 28, Item 4) on front hood support (Figure 28, Item 1).
15. Install ground level switch connector (Figure 28, Item 6) on connector bracket (Figure 28, Item 5).
16. Install new tiedown strap (Figure 28, Item 7) on ground level shutdown switch (Figure 28, Item 8).
0385-30


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.