• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Line Clamps at Left Frame.
Figure 20. Hose and Fitting at Left Frame.

Field Maintenance Manual For Military 621G Scraper -4 Page Navigation
  800    801    802    803    804  805  806    807    808    809    810  
img
.
TM 5-3805-296-23-4
0272
INSTALLATION CONTINUED
NOTE
Remove plugs and caps from hoses and fittings.
Install elbow as noted during removal.
Install hose as tagged and marked during removal.
17. Install new O-ring (Figure 20, Item 2) and fitting (Figure 20, Item 3) on line (Figure 20, Item 1).
18. Install new O-ring (Figure 20, Item 5) and elbow (Figure 20, Item 6) on fitting (Figure 20, Item 3), and tighten
jam nut (Figure 20, Item 4).
19. Install new O-ring (Figure 20, Item 7) and hose (Figure 20, Item 9) on elbow (Figure 20, Item 6), and tighten
tube nut (Figure 20, Item 8).
Figure 20. Hose and Fitting at Left Frame.
0272
0272-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.