• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BOWL FLOOD LAMP REPLACEMENT
CUTTING EDGE FLOOD LAMP REPLACEMENT

Field Maintenance Manual For Military 621G Scraper -4 Page Navigation
  743    744    745    746    747  748  749    750    751    752    753  
img
.
TM 5-3805-296-23-4
0267
CLEANING AND INSPECTION
000267
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0539).
END OF TASK
INSTALLATION
000267
NOTE
Install wiring harness connectors as tagged during removal.
1. Install bolt (Figure 2, Item 1), flood lamp (Figure 2, Item 5) and washer (Figure 2, Item 3) on machine.
2. Install washer (Figure 2, Item 3) and new locknut (Figure 2, Item 2) on bolt (Figure 2, Item 1).
3. Connect wiring harness connector (Figure 2, Item 4) on flood lamp (Figure 2, Item 5).
Figure 2. Bowl Flood Lamp.
0267
END OF TASK
FOLLOW-ON TASKS
000267
Verify correct operation of machine (TM 5-3805-296-10).
END OF TASK
END OF WORK PACKAGE
0267-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.