TM 5-3805-296-23-6
0430
REMOVAL CONTINUED
1. Remove four bolts (Figure 9, Item 1), washers (Figure 9, Item 2), two flange halves (Figure 9, Item 3),
and hydraulic line (Figure 9, Item 6) from hydraulic line (Figure 9, Item 4).
2. Remove O-ring (Figure 9, Item 5) from hydraulic line (Figure 9, Item 6). Discard O-ring.
3. Remove four bolts (Figure 9, Item 11), washers (Figure 9, Item 10), two flange halves (Figure 9, Item 13), and
hydraulic line (Figure 9, Item 14) from hydraulic line (Figure 9, Item 6).
4. Remove O-ring (Figure 9, Item 12) from hydraulic line (Figure 9, Item 14). Discard O-ring.
5. Remove two bolts (Figure 9, Item 9), washers (Figure 9, Item 8), clamp (Figure 9, Item 7), and hydraulic line
(Figure 9, Item 6) from hitch.
6. Remove hydraulic line (Figure 9, Item 6) from machine.
Figure 9. Left Line.
0430
END OF TASK