TM 9-6230-210-13&P
NOTE
Pull out and tip up to remove circuit beaker.
j. Remove circuit breaker (11).
k Tag and identify lead.
l. Loosen screw (12) and remove lead (13).
m. Remove remaining circuit beakers in the same manner.
n. Replace defective parts with serviceable items from stock
o. Install lead and remove tag.
p. Tighten screw.
NOTE
Tilt upwards to engage over bar; then push down to engage in spring clip.
q. Install all circuit beakers.
r. Install two leads on toggle switch and remove tags.
s. Tighten two screws.
t. Install switch (9) in panel.
u. Place plate (8) over protruding end of switch.
v. Install locknut (7) and tighten.
w. Install control panel inner cover (4) on control panel and secure with assembled screw (3).
x. Install control panel outer cover (2) on control panel and secure with two assembled screws (1).
y. Perform operational check (para 2.8).
TEST
4-54