TM 9-4940-568-34
4-9
NOTE
MAST UP lever must be held in
the full up position during Step
(13).
(13)
With the aid of an assistant, monitor
pressure reading on test meter (5) and
loosen nut (11) on high pressure valve (12).
NOTE
If 3100 to 3500 pressure cannot
be reached, replace hydraulic
pump (Para 4-2).
(14)
Turn adjustment screw (13) until pressure
is between 3100 to 3500 on test meter (5)
and tighten nut (11).
(15)
Move crane power switch (6) to OFF.
(16)
Shut down generator.