TM 9-4940-568-34
3-64
3-17. BOOM BASE SECTION REPLACEMENT (Continued)
END OF TASK
Follow-On Maintenance
Install hoist assembly
(para 3-26).
Install hoist proximity
sensor (para 3-23).
Install overload shutdown
(para 3-27).
Install boom mid section
and telescopic cylinder
(para 3-15).
Install boom fly section
(para 3-16).
Install tubing and hoses
(para 3-43 and para 3-44).
Lubricate pivot pins,
(TM 9-4940-568-10).
Check crane for proper
operation and hydraulic
leaks, (TM 9-4940-568-10).
Load test crane
(para 3-5).