12
11
20
10
21
17
6
4
5
9
18
19
17
7
8
13
14
15
16
TM 9-4940-568-20
5-12
5-4.
JUNCTION BOX MAINTENANCE (Continued)
NOTE
Before removing wires, tag and
mark with corresponding
numbers from illustration and
legend.
All wires are installed on terminal
block with a screw. Screw must
be removed prior to removal of
wires from terminal block.
(2) Remove two black wires (4 and 5) from
grounding block (6).
(3) Remove white wire (7) from no. 19
position and white wire (8) from no. 5
position of terminal block (9).
(4) Remove locknut (10) and solenoid
cables (11) from junction box (12).
(5) Remove green wire (13) from grounding
block (6).
(6) Remove left side black wire (14) from
no. 1 position, left side red wire (15)
from no. 17 position, and right side
white wire (16) from no. 19 position of
terminal block (9).
(7) Remove four nuts (17), screws (18),
lockwashers (19), OSS cable (20) and
preformed packing (21) from junction
box (12). Discard lockwashers and
performed packing.