TM 9-4940-568-20
4-15
Materials/Parts
Adhesive (Item 2, Appendix C)
Caulk (Item 11, Appendix C)
Rags, Wiping (Item 30, Appendix C)
This task covers:
a. Removal
b. Disassembly
c. Cleaning/Inspection
d. Assembly
e. Installation
f. Adjustment
INITIAL SETUP
Personnel Required
Two
Equipment Condition
FRS unloaded, (TM 9-4940-568-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 30, Appendix G)
Scale, Tension (Item 23, Appendix G)
Lifting Device, Minimum Capacity 300 lbs
(136 kg)
Wooden Blocks (Appendix D)
4-4. DOOR ASSEMBLY REPAIR.
Materials/Parts Cont.
Sealing Compound (Item 33, Appendix C)
Solvent, Drycleaning (Item 38, Appendix C)
Cotter Pin (2) (Item 92, Appendix F)
Locknut (10) (Item 33, Appendix F)
Seal (Item 102, Appendix F)
a.
Removal.
1
Shelter door weighs 220 lbs (100 kg) and must be supported during door replacement.
Use a suitable lifting device of adequate capacity to support door for removal and
installation to prevent possible injury to personnel.
NOTE
The following procedures are identical for both doors. Left side is shown
Place wooden block under platform prior to support arm removal.
(1)
With the aid of an assistant, position lifting device to support door assembly (1).