TM 9-2330-359-14&P
4-52. LANDING LEG REPLACEMENT.
This Task Covers:
a .
Removal
b.
Installation
Initial Setup:
Materials/Parts:
Tools/Test Equipment:
Twelve Iockwashers (all except M872A3)
c General mechanics tool kit
l Thirteen Iockwashers (M872A3)
Personnel Required: Two
NOTE
l Right and left side landing legs are removed the same way.
l Shaft has been modified on new model landing legs. Old model has a three piece
shaft; new model has a two piece shaft.
1.
Position suitable support under front of semitrailer.
2.
Raise landing legs enough to relieve load from landing gear.
3.
Remove two nuts (6), washers (3 and 5), screws (2), and shaft (4) from landing leg (1).
TA706581
Change 2
4-97