TM 9-2330-359-14&P
4-36. AIR LINES AND FlTTINGS MAINTENANCE (M872A3) (Cont).
11.
Install two bushings (24) on airbrake chambers.
12.
Install two adapters (25), hose assemblies (26), and bushings (27) on tees (21).
13.
Install two bushings (27) on airbrake chambers.
14.
Install two adapters (15), hose assemblies (16), and bushings (17) on emergency relay valve (3).
15.
Install two bushings (17) on airbrake chambers.
16.
Install draincock (32) on air reservoir (1). Close draincock.
FOLLOW-ON TASKS:
l Perform air leakage test (para 4-37).
4-65