TM 5-3805-296-23-6
0415
INSTALLATION CONTINUED
20. Install new O-ring (Figure 26, Item 3) on hydraulic hose (Figure 26, Item 2).
21. Install hydraulic hose (Figure 26, Item 2), two flange halves (Figure 26, Item 5), four washers
(Figure 26, Item 6), and bolts (Figure 26, Item 1) on rear main control valve (Figure 26, Item 4).
Figure 26. Apron Down Control Valve Connection.
0415