18
TM 5-3805-296-23-6
FIELD MAINTENANCE
-
LEFT FENDER REPLACEMENT
039
0
Left Fender Removal, Left Fender Bracket Removal, Left Fender Disassembly, Cleaning and
Inspection, Left Fender Assembly, Left Fender Bracket Installation, Left Fender Installation
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Cotter pin, 3B5301 (WP 0551, Item 96)
0
(WP 0550, Item 181)
Locknut, 3K2889 (WP 0551, Item 105) (3)
0
0
Bolt, 3/8 x 16 x 1.25 (WP 0550, Item 16) (2)
Locknut, 3K6060 (WP 0551, Item 106) (7)
0
0
Link, Bracket (2,250-lb capacity) (WP 0550,
Personnel
Item 102) (2)
0
0
Two
Nut, Plain, Hexagon, 3/8 x 16 (WP 0550, Item 110)
0
0
Washer, Flat, 3/8 (WP 0550, Item 189) (3)
References
0
0
Wheel Chock (WP 0550, Item 192)
0
WP 0539
0
Wrench, Combination, 1-5/16" (WP 0550,
Equipment Conditions
Item 198)
0
0
Lifting equipment, 300-lb capacity
Machine parked (TM 5-3805-296-10)
0
0
Materials/Parts
Drawings Required
0
0
Cleaning Compound, Solvent, Type III
RPSTL Figures 94 and 111
0
(WP 0549, Item 8)
0
Estimated Time to Complete
Rag, Wiping (WP 0549, Item 28)
0
0
3.5 hr
0
0390-1