TM 5-3805-296-23-5
0347
INSTALLATION CONTINUED
28. Install three P-clamps (Figure 25, Item 4), washers (Figure 25, Item 3), and bolts (Figure 25, Item 1) on bosses
(Figure 25, Item 2).
Figure 25. P-clamps Near Fuel Tank.
0347
NOTE
Install wiring harness as noted during removal.
Install tiedown straps as noted during removal.
29. Install cover (Figure 26, Item 9) on wiring harness connector (Figure 26, Item 8).
30. Install new tiedown strap (Figure 26, Item 6) on wiring harness (Figure 26, Item 7) and ladder clip
(Figure 26, Item 5).
31. Install new tiedown strap (Figure 26, Item 4) on wiring harnesses (Figure 26, Item 3).
32. Install new tiedown strap (Figure 26, Item 2) on wiring harnesses (Figure 26, Item 1) and machine.