• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. ECM Wiring Harness Brackets.
Figure 17. Splash Shield.

Field Maintenance Manual For Military 621G Scraper -4 Page Navigation
  416    417    418    419    420  421  422    423    424    425    426  
img
.
TM 5-3805-296-23-4
0252
INSTALLATION CONTINUED
NOTE
Install tiedown straps as noted during removal.
12. Install fuel lines (Figure 15, Item 10), air hose (Figure 15, Item 11), four clamps (Figure 15, Item 4), wiring
harness routing brackets (Figure 15, Item 7), two washers (Figure 15, Item 5), and two bolts (Figure 15, Item 6)
on bracket (Figure 15, Item 8).
NOTE
Install wiring harnesses and lines as noted during removal.
13. Install two ECM wiring harness connectors (Figure 15, Item 2) on ECM (Figure 15, Item 9) and tighten two
bolts (Figure 15, Item 3).
14. Install two new tiedown straps (Figure 15, Item 1) on two ECM wiring harness connectors (Figure 15, Item 2).
Figure 15. ECM Wiring Harness Connectors.
0252
0252-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.