2
1
TM 9-4940-568-10
2-48
2-11. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
TABLES (CONT).
Table 2-5. Operators Level Preventive Maintenance Checks and Services (Monthly) (CONT).
Item
No.
Interval
Item to
Check/
Service
Procedure
Not Fully Mission
Capable If:
Do not operate crane unless both outrigger jacks are properly set up. Shelter
could turn over causing serious injury or death.
48
Monthly
Crane Control
Levers
(a) Move HOIST control lever (1) to DOWN
position and lower hoist cable about
12 in. (305 mm).
Cable will not pay out.
Care must be taken when disconnecting HOIST load hook from hook block
tiedown. A swinging hook block can cause serious injury or death to personnel.
(b) Disconnect load hook (2) from hook block
tie down.
(c) Check load hook for cracks. Hook will
have to be replaced if cracked.
Hook is cracked.