TM 9-4940-568-34
3-127
(6) Install hoist control valve (9) on
hydraulic
motor
(10)
with
four
lockwashers (8) and screws (7).
(7) Install preformed packing (5) and
connect hose (4) to fitting (6).
(8) Install two preformed packings (2) and
connect two hoses (1) to fittings (3).
END OF TASK
Follow-On Maintenance
Install holding valve
(para 3-39).
Check crane for proper
operation and hydraulic
leaks,
(TM 9-4940-568-10).
Load test crane
(para 3-5).