HOIST CABLE REPLACEMENT (Continued)
b. Installation
(1) Route cable (2) over and around drum
(4).
(2) Route cable (2) up through sleeve (3)
and back down into sleeve (3), making a
loop.
(3) Insert wedge (1) in cable (2) loop and
pull cable (2) and wedge (1) into sleeve
(3).
(4) Drive wedge (1) and cable (2) into
sleeve (3) until fully seated.
(5) Start FRS and turn crane main power
switch ON.
NOTE
After one complete layer of
cable is on drum, provide
tension on cable so that
cable spools on tightly.
Leave
enough
cable
unspooled
to
allow
installation of hook block.
(6) Install 75 feet of cable (2) onto drum (4)
(TM 9-4940-568-10).
END OF TASK
Follow-On Maintenance
Install hook block
assembly
(Para 5-6)
Stow crane