TM 55-8115-204-23&P
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Page
Repair Parts and Special Tools
Inspection Upon Receipt of
List (RPSTL) and Support
Loaded Cargo Container
2-2
Equipment
2-1
Preventive Maintenance Checks and
Special Tools and Support
Services
2-3
Equipment
2-1
Preventive Maintenance Checks
2-3
Repair Parts
2-1
Services
2-3
Service Upon Receipt
2-2
Unit Maintenance
2-13
Inspection Upon Receipt
2-2
General
2-13
SECTION I. Repair Parts and Special Tools List (RPSTL) and Support Equipment
2-1. Special Tools and Support Equipment. Refer to Maintenance Allocation Chart (MAC), Appendix B and
RPSTL, Appendix C. Inspection will in most circumstances determine the maintenance that will be necessary.
2-2. Repair Parts. Some repair parts are designed to replace original equipment. For example, a damaged
side panel will be repaired using a panel section specifically designed to repair a section of a side panel rather
than repairing a total side panel section. Refer to the Repair Parts and Special Tools List, Appendix C, for
identification of these repair items
2-1