TM 5-4930-244-14
c.
Installation.
NOTE
All items must be placed on panels with holes aligned before installing rivets.
(1)
Align holes in storage pocket (8) to holes in side panel (6), securing it with rivets (7).
(2)
Install four latch retainer D-rings (4) with rivets (5) to top panel (1).
(3)
For all other side panels, position panels (6) and fasten with rivets (3).
NOTE
Seal along all outside edges of top panel (1) with synthetic rubber caulking
compound.
(4)
Install top panel (1) with rivets (3).
4-20