TM 5-3895-358-14&P
This time includes preparation time, troubleshooting time, and quality assurance/quality control time in addition
to the time required to perform the specific tasks identified for the maintenance functions authorized in the
Maintenance Allocation Chart.
e. Column 5, Tools and Equipment: Column 5 specifies by code those common tool sets (not individual
tools) and special tools, test and support equipment required to perform the designated function.
f. Column 6, Remarks: Column 6 contains an alphabetic code which leads to the remark in Section IV,
Remarks, which is pertinent to the item opposite the particular code.
Section II. MAINTENANCE ALLOCATION CHART
MELTER, ASPHALT, SKID MOUNTED MODEL STMD-3000
(4)
(3)
(5)
(1)
(6)
(2)
TOOLS
MAINTENANCE
MAINTENANCE CATEGORY
COMPONENT
GROUP
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIP
REMARKS
C
O
F
H
D
15Frame, Towing
Attachments and
Drawbars
1501
Frame Assy
1,2
Base Skid
Replace
.1
Repair
.2
Tunnel Supports
Replace
.5
Repair
.1
Tunnel Doors
Replace
.5
Support Arms
Repair
.5
Rope Nylon
Replace
.3
22
Body, Chassis and
Hull Accessory Items
1
2210
Data Plates
Plate, Instruction
Replace
.3
1,2
Plate, Data
Replace
.3
47
Gauges (Non-Electrical
Weighing and Measuring
1
Devices)
4702
Gauge, Temperature
Replace
.3
60
6001
Housing
1,2
Flashing, Sides
Replace
.5
and Ends
Valve, Gate
Replace
.5
2 in
Repair
.5
Valve, Gate 3 in
Replace
.5
Jacketed
Replace
4.0
Repair
4.0
Pipe Assembly
Replace
.2
Pipes, Elbows, Fitting
Plugs
Replace
1.5
Gaskets and Packings
Replace
1.5
Tank, Melting and
Storage
Service
.2
Replace
3.0
Repair
2.0
Accessory Items
Tubing, Flexible
Replace
1
Metal
D-2