Home
Download PDF
Order CD-ROM
Order in Print
Section I. INTRODUCTION
Figure 1-1. Asphalt Melter, Model STMD-3000, right front, three-quarter view.
Section II. INSTALLATION
Figure 2-1. Asphalt Melter in shipping configuration.
Figure 2-2. Installing tackle supports.
Figure 2-3. Installing rain shields.
Figure 3-1. Controls and Instruments
Initial Start-Up
Section IV. MAINTENANCE INSTRUCTIONS
Section V. PREPARATION FOR SHIPMENT OR STORAGE
Section VI. REPAIR PARTS LIST
Figure 6-1. Asphalt Melter basic piping and valve installation.
Figure 6-1. Basic unit valves and piping - legend.
Figure 62. Hot oil and asphalt piping for single unit Installation.
Figure 6-2. Hot oil and asphalt piping for single unit installation - legend.
Figure 6-3. Hot oil and asphalt piping for multiple unit installation.
Figure 6-3. Hot oil and asphalt piping for dual unit operation - legend.
Figure 6-4. Asphalt Melter basic components.
Figure 6-4. Asphalt melter basic components - legend.
PART II. SUPPLEMENTAL OPERATING, MAINTENANCE AND REPAIR PARTS INSTRUCTIONS (SOMARPI)
SECTION I. GENERAL
SECTION II. MAINTENANCE
Maintenance Forms and Records
SECTION III. REPAIR PARTS SUPPLY
REFERENCES
WARRANTY GUIDELINES
BASIC ISSUE ITEMS LIST
MAINTENANCE ALLOCATION CHART
Section II. MAINTENANCE ALLOCATION CHART
Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS
Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS - Continued
APPENDIX E. PRESCRIBED LOAD LIST (PLL) - AUTHORIZED STOCKAGE LIST (ASL)
APPENDIX F. SAMPLE FORMAT DA FORM 2765 PART NUMBER REQUEST (CONUS REQUESTOR)
APPENDIX G. SAMPLE FORMAT - MILSTRIP REQUISTION FOR CCE (NSN)
APPENDIX H. SAMPLE FORMAT - MILSTRIP REQUISTION FOR CCE (NON-NSN)
APPENDIX H. SAMPLE FORMAT - MILSTRIP REQUISTION FOR CCE (NON-NSN) - Continued
APPENDIX I. SAMPLE FORM - MILSTRIP REQUESTION FOR (NON-NSN) (MANUAL)
INSTRUCTIONS
APPENDIX J. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Table. J- 1. Operator/Crew Preventive Maintenance Checks and Services