TM 5-3820-245-14&P
B.
Long distance movement
1.
Refer to Page 10 and remove the auger from auger shaft.
CAUTION
REMOVING AUGER FROM CARRIER, SEE PAGE 10.
2.
Drain the auger engine fuel tank.
3.
Refer to Page 8 and remove the front, center, and rear mounting hardware securing the auger
assembly to the truck frame.
4.
Use a suitable lifting device with at least 15,000 pounds capacity and lift auger assembly from the
truck frame.
5.
Refer to TM 38-230-2 and prepare the auger assembly for shipment to the new work-site.
C.
Reinstallation after movement
1.
Remove all packaging and preservation tape from the auger assembly.
2.
Reinstall the auger assembly on the carrier frame per Page 8.
PAGE 27