• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART FOR FAIRLEAD AND LAGGINGS - Continued
OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)

Maintenance Manual For Fairlead And Laggings Page Navigation
  15    16    17    18    19  20  21    22    23    24    25  
img
TM 5-3815-223-14&P
SECTION II. MAINTENANCE ALLOCATION CHART
GROUP
MAINTENANCE
MAINT CAT*
TOOLS &
NUMBER
COMPONENT/ASSEMBLY
FUNCTION
(4)
EQUIP
REMARKS
(1)
(2)
(3)
C
O
F
H
D
(5)
(6)
74
Cranes, Shovels and
Earthmoving Components
7411
Crane, Dragline or
Clamshell Attachments
Fairlead Assembly
Grooved Pulley
Inspect
0.1
Replace
2.0
Repair
1.0
Pawls
Inspect
0.1
Replace
0.8
Limit Switch
Inspect
0.1
Replace
0.8
Bearing
Inspect
0.1
Replace
1.0
Lagging & Drum Assembly
Lagging
Inspect
0.1
Replace
2.0
Drum
Inspect
0.1
Replace
2.0
Repair
4.0
Wire Rope
Inspect
0.1
Replace
2.0
Boom Point Assembly
Sheave
Inspect
0.1
Replace
2.0
Repair
*MAINTENANCE CATEGORIES:
C - OPERATOR/CREW
F - DIRECT SUPPORT
D - DEPOT
O - ORGANIZATIONAL
H - GENERAL SUPPORT
TA FORM 668-1
1 NOV 83
B-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.