TM 1-1740-204-13&P
4-2.
MAINTENANCE OPERATIONS
These instructions provide the proper technique and detailed procedures required to perform the maintenance
operations. Each maintenance operation provides step-by-step instructions in the order in which the work is most
logically accomplished. Any unusual or critical steps are covered in detail.
4-3.
TOOLS AND TEST EQUIPMENT LIST
Tools and test equipment required for maintenance of the High Pressure Nitrogen Servicing Cart are identified in the
Maintenance Allocation Chart, Appendix B.
4-4.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
There are no special tools required for test or inspection procedures at the AVIM level.
4-5.
REPAIR PARTS
Repair parts are listed in the Repair Parts and Special Tools List (RPSTL) in Appendix C of this manual.
Section II. Service Upon Receipt
4-6.
GENERAL
a.
Visually check the exterior of the High Pressure Nitrogen Servicing Cart for apparent damage. Check
contents to assure that all components listed in APPENDIX C (RPSTL) of this manual are enclosed and
undamaged.
b.
If the equipment has been damaged, report the damage on SF 368 (REPORT OF DISCREPANCIES).
Check the equipment against the packing slip to see if the shipment is complete. Report any discrepancies
in accordance with the instructions of DA PAM 738751.
4-2
