Item No.
Requirement
Complication
6
Distance from bridge to river mouth or some other
About 2 km above the mouth of the Mosel
river reference point.
River at the Rhine River.
7
Latitude and Longitude of the major item.
5022'N, 735'E. (From GSGS Map 4416-
S2).
8
Nord du Guerre: L897961, From GSGS Map
4416-S2. (UTM:399580 from AMS M641-
S-2).
9
Name or number of roadway or name of railroad
Adolf Hitler. Street in Koblenz. Carries gen-
which bridge serves. Also give type of traffic car-
eral highway and pedestrian traffic.
ried: (for example, general highway or pedestrian).
10
Type of bridge (fixed, suspension, floating, and so on).
Fixed, hinged-deck arch.
11
Military type or load classification.
NI.
12
Date bridge was completed.
1934.
13
Lengths:
a. Total (including approaches).
a. 843.8m.
b. Main bridge.
b. 338.7m.
c. Left approach (the "left approach" is on the left
c. 356.0m (approximately) to grade.
side facing downstream).
d. Right approach.
d.
161.0m (approximately) to grade.
14
Piers.
a. Number and size.
a.
Left approach: 10 Each 0.8m. River
span: 2 Each 5m. Right approach: None.
b.
Construction material (wooden and so on).
b. All of reinforced concrete.
c.
Distance or span between.
c. Spans: Approach: 5 at 15.0m, 5 at 15.6m,
1 at 16.3m, 1 at 11.8m, and 1 at 10.7m.
River spans: 1 at 100.0m, i at 105.0m,
and 1 at 118.6m.
15
Bridge deck:
a. Width and thickness.
a.
Total width: 18m Roadway: 12m Thick-
ness: NI.
b.
Construction material and pavement type.
b.
NT.
c.
Provision for movement to pass water borne
c.
No provision for movement for water-
traffic.
borne traffic.
16
NI.
macadam, rockfill, and so on, and current state of
repair).
17
Indicate whether elevations are based on mean sea
Meters above the North Sea.
level or on some other reference.
18
Elevations:
NI.
a. Top of bridge deck.
b. Water surface for highest stream stage of record
(HHW) and date of occurrence.
c. Highest navigable water surface, if applicable.
d. Normal or mean water surface.
e. Lowest water surface recorded (LLW) and date
of occurrence.
f. Bottom of stream.
19
Bridge clearance ("bridge clearance" is the maximum
a.
High stage: 9.5m at HHW, 14.0m at high
distance between the water surface of the stream
navigable water
and the underside of the bridge) for high, normal
b. Normal stage: 16.4m.
and low stream stages.
c. Low stage: NI.
20
Sand and gravel.
ample: rocky, muddy, or sandy).
21
Period of record of stream depth at gage. (Give dates
NI.
beginning and end of period).
22
Give maximum and average stream depth at bridge
Stage
Average
Maximum
for high, normal, and low stages.
High
10.5m at HHW 11.5m at HHW
Normal
3.5m
4.5m
Low
NI
NI
High Navigable
6.0m
7.0m
AGO 3989A
14