TM 9-6230-210-13&P
b. Operating Instructions. Located on the upper left hand portion of the splash panel as viewed from the rear of the
Floodlight Set.
Floodlight Set, Trailer Mounted
U.S. Army
N.S.N. 6230-01-056-5238
ASSEMBLY INSTRUCTIONS
1. Attach hinge point to tower support on splash
7. Warning: Check overhead clearance.
panel
8. Winch tower to full operating height.
2. Attach tower cradle to tower and support bar at
9. Readjust jacks if necessary to level unit.
rear of trailer, and install tower.
10. Set ground rod.
3. Thread cable around tower base, through pulley
11. Turn engine generator set ON.
at base of tower support and secure on winch
12. Turn red warning beacon switch to ON.
shaft.
13. Turn floodlight switches to ON allowing 5 seconds
4. Attach light bar and red warning beacon in stor-
interval on each floodlight.
age position on tower.
SHUT DOWN PROCEDURES
5. Attach generator to channel on trailer bed.
1. Turn floodlight and red warning beacon switches
to OFF.
6. Remove 3 each floodlights from sates and se-
2. Turn engine generator set OFF.
cure in brackets at rear of trailer.
3. Retract tower to minimum vertical height.
7. Wire tower power cable to circuit breaker and
4. Attach extension locking bar.
generator matching terminals.
5. Release tilt lock bar.
OPERATING INSTRUCTIONS
6. Lower tower to horizontal position.
7. Secure tower cradle cleat.
1. Extent outrigger jacks level unit.
8. Unplug power leads.
9. Remove red warning beacon and stow.
2. Attach light bar to top of tower and install red
10. Warning: Be careful of hot fixtures.
warning beacon.
11. Remove floodlights after sting & stow.
3. Remove floodlights from storage rack and attach
12. Remove light bar and stow.
to light bar and aim.
13. Retract outrigger jacks and secure.
4. Attach floodlight and beacon power leads to light
14. Remove ground rod and stow.
bar junction box.
5. Release tower cradle cleat.
6. Winch tower to vetical position, insert lock
bar, & remove extension lock bar.
2-26
