1
2
3
TM 9-4940-568-34
7-23
4
(3)
Compress valve spring (2), install valve
collets (3) and release spring tension.
(4)
After assembly, tap valve stems (1) to verify
collets (3) are seated.
e.
Follow-On Maintenance:
Install cylinder head, (Para 5-7).
END OF TASK