TM 9-4940-568-34
5-91
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
FRS unloaded, (TM 9-4940-568-10)
Batteries disconnected, (TM 9-4940-568-10)
Fuel injection lines removed,
(TM 9-4940-568-20)
Tools and Special Tools
Tool Kit, General Mechanics
(Item 67, Appendix F)
Puller, Mechanical (Item 47, Appendix F)
Socket Set, 3/8 in. (Item 52, Appendix F)
Tool, Engine Turnover (Item 66, Appendix F)
Wrench, Torque (0 to 175 lb-Ft [0237 N.m])
(Item 83, Appendix F)
Wrench, Torque (0 to 60 N.m)
(Item 85, Appendix F)
5-17. FUEL INJECTION PUMP REPLACEMENT.
Materials/Parts
Tags, Identification (Item 36, Appendix B)
Gasket, Fuel Pump (Item 22, Appendix E)
Lockwasher (Item 59, Appendix E)
Washer, Sealing (4) (Item 180, Appendix E)