TM 9-4940-568-34
3-161/(3-162 blank)
e. Installation
(1) Install manual override valve (1) and
tighten nut (16) on fitting (17).
(2) Install preformed packing (14) and hose
(13) on tube (15).
(3) Install square seal (12) and connector
(11), tighten screw (10).
(4) Install manual override guard (8) using
two washers (7), lockwashers (6) and
screws (5) on crane (3).
(5) Install safety lock seal (4).
(6) Install hydraulic line quick disconnect
(2) on crane supply line (3).
END OF TASK
Follow-On Maintenance
Install crane control
valves (para 3-35).
Install electric solenoid
valves (para 3-37).
Connect batteries,
(TM 9-4940-568-10).
Check crane for leaks
and proper operation,
(TM 9-4940-568-10).
13
16
5
4
6
7
8
17
15
1
11
10
12
9
14
2
3