TM 9-4940-568-34
3-135
(18) Tighten two screws (8) to 135 lb-ft (183
N.m).
(19) Connect preformed packing (7) and
hose (6) to boom assembly (3).
(20) Connect four preformed packings (5)
and hoses (4) to boom assembly (3).
NOTE
Install plastic cable ties and
cable clamps as required.
(21) Connect electrical connector (1) to
overload shutdown box (2).
END OF TASK
NOTE
Follow-On Maintenance
Lubricate crane,
(TM 9-4940-568-10).
Install hoist cable
(para 5-5).
Load test crane
(para 3-5).