TM 9-4940-568-20
5-46
5-11. CONTROL SOLENOID CABLE REPLACEMENT (Continued)
NOTE
Installation of harness and
wires in junction box is
covered in junction box
replacement (para 5-4).
(5) Install solenoid cable (1) in junction box
(2).
END OF TASK
Follow-On Maintenance
Connect batteries
(TM 9-4940-568-10)
Connect solenoid
wires to junction box
(para 5-4)
Check crane for proper
operation
(TM 9-4940-568-10)
1
2
1
1
1
1