2-29. MATERIAL HANDLING CRANE (MHC) OPERATION (CONT).
17
16
18
20
19
(10)
Move RH O/R JACK lever (19) to DOWN position and lower jack cylinder (17) until ball end is seated
in outrigger pad (16).
(11)
Install retaining pins (18) on outrigger pad (16).
(12)
Move LH O/R JACK lever (20) to down position and lower jack cylinder (17) until ball end is seated in
outrigger pad (16).
(13)
Install retaining pins (18) on outrigger pad (16).