TM 9-4940-568-10
2-120
2-28. CRANE BOOM LIGHT OPERATION (CONT).
4
5
6
7
2
3
NOTE
24 VOLT DC PANEL power switch must be in the ON position.
(3)
Turn MASTER DISCONNECT switch (6) to ON.
(4)
Turn BOOM LIGHT switch (7) to desired setting DIM/MID/BRT.
(5)
Turn BOOM LIGHT switch (7) to OFF.
(6)
Turn MASTER DISCONNECT switch (6) to OFF.
(7)
Remove pin (2) from stud (4) and install pin on mount (3) to stow boom light (5).