TM 9-4940-568-10
2-67
Section III. OPERATION UNDER USUAL CONDITIONS
2-12. PREPARING PLS FORWARD REPAIR SYSTEM (FRS) FOR OPERATION.
Do not attempt to open doors and access platforms while FRS is loaded on vehicle.
Failure to comply may result in injury or death to personnel.
Secure all equipment on FRS before unloading or loading from vehicle. Failure to comply
may result in injury to personnel.
a.
Unload FRS from vehicle (TM 9-2320-364-10).
Electric power generating equipment must be grounded as a safety precaution. Stray
electrical current can injure or kill personnel and damage the equipment.
b.
Ground FRS (Para 2-32).
NOTE
The following procedures are identical for both doors. Left side is shown.
Shelter door has two latches, right side shown.
c.
Remove lock (1) from door latch (2).
d.
Release and open door latch (2).
e.
Stow lock (1) on door latch (2).
f.
Repeat Steps c. through e. for left door latch.
2
1