• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLEARANCE   LIGHT   MAINTENANCE   (M872A3)   (Cont) - TM-9-2330-359-14P_91
BLACKOUT   LIGHT   MAINTENANCE   (Cont).

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  70    71    72    73    74  75  76    77    78    79    80  
TM   9-2330-359-14&P 4-26.   BLACKOUT   LIGHT   MAINTENANCE. This Task Covers: a. Lamp  Replacement c. Installation b.   Removal Initial  Setup: Equipment   Conditions: Towing  vehicle  electrical  connector  disconnected from semitrailer (para 2-18). Tools/Test Equipment: General mechanic’s tool kit 1. 2. 3. 4. 5. 6. 7. Materials/Parts: Marker tags (Item 13, Appendix E) Eight Iockwashers Loosen six screws (5) and remove door (6) and six Iockwashers (4) from body (7). Discard lockwashers. Inspect preformed packing (3) for damage. If damaged, remove and discard. Remove two lamps (2) from sockets (1) by pushing lamps in and turning counterclockwise. Install two lamps (2) in sockets (1) by pushing lamps in and turning clockwise. If removed, install new preformed packing (3) in door (6). Install six new Iockwashers (4) on screws (5). Install door (6) on body (7) and tighten six screws (5). TA508009 4-30







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.