• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SPECIFIC   PMCS   PROCEDURES - TM-9-2330-359-14P_31
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - CONT - TM-9-2330-359-14P_33

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  12    13    14    15    16  17  18    19    20    21    22  
TM 9-2330-359-14&P 2-8.   LEAKAGE   DEFINITIONS   (Con’t). CAUTION When operating with Class I or II leaks, continue to check fluid levels In addition to that required In PMCS. Parts without fluid with stop working or may be damaged. b. Equipment operation is allowed with minor (Class I or II) leakage. Fluid levels in an item/system affected with such leakage must be checked more frequently than required in PMCS. When in doubt, notify your supervisor. c. Report Class Ill leaks IMMEDIATELY to your supervisor. Table  2-1.  Operator/Crew  Preventive  Maintenance  Checks  and  Services  (PMCS). B - Before D - During A - After W - Weekly M - Monthly INTERVAL ITEM TO BE INSPECTED ITEM PROCEDURE Check for and have repaired, filled, or Equipment la Not NO. B D A W    M adjusted as needed. Ready/Available  If: NOTE Perform Before (B) PMCS If: l You are the assigned operator, but have not   used   semitrailer   since   the   last inspection. l You are using the semitrailer for the first time. 1 VEHICLE  EQUIPMENT l a.   Check   tools,   mounted   equipment,   publica- tions, and necessary forms for presence and general  condition. l b.  Check  wheel  chocks  and  ground  boards  for looseness of mounting or connection. l c. Check for presence of stakes and racks. Mission  requires  side  racks  or stakes and they are missing. 2 TOWING   CONNECTIONS l Check kingpin (5), air couplings (1 and 4), and electrical receptacles (2 and 3) for proper connec- tions (para 2-10). 2-4 Change 2







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.