• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
S e c t i o n   I l .   M A I N T E N A N C E   A L L O C A T I O N   C H A R T   ( C o n  t )
SECTION III. TOOL AND TEST EQUIPMENT REQUIREMENTS

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  184    185    186    187    188  189  190    191    192    193    194  
TM 9-2330-359-14&P S e c t i o n     I l .     M A I N T E N A N C E     A L L O C A T I O N     C H A R T     ( C o n ’ t ) (1) (2) (3) (4) (5) (6) Maintenance Level Unit Group DS GS Depot Maintenance Tools and Number Component/Assembly Function C O F H D Equipment    Remarks 1501 Frame  Assembly  (Con't) Twist Lock Service 0.5 1 , 2 , 3 Replace 1.0 1 , 2 ,3 Repair 0.1 1 ,2,3 Air Hose and Electrical Replace 1.5 1 , 2 , 3 Harness Support Repair 1.0 1 , 2 , 3 1502 Kingpin Service 0.2 1 , 2 , 3 Replace 8.0 1 , 4 , 5 1503 Sling  Provision Service 0.3 1 , 2 , 3 Replace 1.5 1 , 2 , 3 1504 Spare Wheel Carrier Replace 1.5 1 ,4,5 1506 Fifth Wheel Plate Service 0.1 1 , 2 , 3 1507 Landing Gear Replace 1.0 1 , 2 , 3 16 SPRINGS AND SHOCK ABSORBERS 1601 Springs Replace 4.0 1 , 2 , 3 1605 Radius  Rods Replace 1.5 1 , 2 , 3 18 BODY 1801 Body Side  Racks Replace 0.5 Repair 1.0 1 , 2 , 3 Mudflaps Replace 0.5 1 , 2 , 3 22 BODY, CHASIS, AND ACCESSORY   ITEMS 2202   Accessory Items Reflectors Replace 0.2 1 , 2 , 3 2210   D ata Plates Replace 0.2 1 , 2 , 3 Spare Wheel Carrier Chain Replace 0.2 1 , 2 , 3 Change 2 B - 5







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.