• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRUNNION    REPLACEMENT
Section   V.   BODY   MAINTENANCE - TM-9-2330-359-14P_193

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  169    170    171    172    173  174  175    176    177    178    179  
TM  9-2330-359-14&P Section   V.   BODY   MAINTENANCE 5-13.   FLOOR   REPLACEMENT. This Task Covers: Replacement Initial Setup: Equipment  Conditions: Tools/Test Equipment: l Wheels chocked. l General mechanic’s tool kit s 1/4 in. apex bit (Item 1, Appendix D) REPLACEMENT 1. Remove screw (2) and damaged section of floor boards (1) from frame (3). 2. Using floor boards (1) as a template, cut new floor boards. 3. Place board (1) into position on crossmember (4). 4. Drill 9/32 in. diameter hole through two boards (1) and crossmember (4). NOTE The cut ends of boards must be centered on a crossmember. 5. Install new floor board (1) on frame (3) with screws (2). 6. Repeat steps 1 through 3 for remaining boards (1) that were removed. 5-20







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.