• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SPRINGS   AND   EQUALIZING   BEAMS   REPLACEMENT   (Cont)
Section   V.   BODY   MAINTENANCE - TM-9-2330-359-14P_192

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
TM  9-2330-359-14&P 5-12.    TRUNNION    REPLACEMENT. This  Task  Covers: a.   Removal b. Installation InitiaI  Setup: Equipment  Conditions: Tools/Test Equipment: s  Equalizing  beams  removed  (para  5-11). l  General  mechanic’s References: l Welder’s tool kit tool  kit l TM 9-247 Personnel  Required:  Two l TB 9-2300-247-40 1. Cut welds on trunnion (8). 2. Remove  four  nuts  (4),  flatwashers  (5),  and  bolts  (6) from bracket (7) and frame. 3. Remove two nuts (3), flatwashers (2), bolts (1), and bracket (7) from trunnion (8). 4. Repeat steps 1 through 3 for other side of trunnion (8). b. INSTALLATION NOTE Refer  to  TM  9-237  for  welding  instructions  and  TB  9-2300-247-40  for  frame  repair instructions. 1. Spot weld topside inboard of trunnion (8) to bracket (7). Install two bolts (1), flatwashers (2), and nuts (3) on bracket and trunnion. Torque nuts 250 Ib.-ft. (339 N• M). 2. Install bracket (7) or frame with four bolts (6), flatwashers (5), and nuts (4). FOLLOW-ON  TASKS: l Install equalizing beams (para 5-11). TA508090 5-19







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.