• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION OF   EQUIPMENT   FOR   ADMINISTRATIVE   STORAGE   (Cont)
REMOVAL   OF   EQUIPMENT   FROM   ADMINISTRATIVE   STORAGE

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  152    153    154    155    156  157  158    159    160    161    162  
TM 9-2330-359-14&P 4-64.   CARE   OF   EQUIPMENT   IN   ADMINISTRATIVE   STORAGE. a. Maintenance Services.  After equipment has been placed in administrative storage, inspect, service, and exercise  as  specified  herein. b. Inspection. Inspection will usually be visual and must consist of at least a walk-around examination of all equipment to detect any deficiencies. Inspect equipment in open storage weekly and equipment in covered storage monthly. Inspect all equipment immediately after any severe storm or environmental change. The following are examples of things to look for during a visual inspection: (1)  Low  or  flat  tires. (2) Condition of preservatives, seals, and wraps. (3)  Corrosion  or  deterioration. (4)  Missing  or  damaged  parts. (5)  Water  in  compartments. (6) Any other readily recognizable shortcomings or deficiencies, c. Repair During Administrative Storage.  Keep equipment in an optimum state of readiness. Accomplish the required services and repairs as quickly as possible. Whenever possible, perform all maintenance on-site. d. Exercising.  Exercise equipment in accordance with Table 4-3,  Exercise Schedule,  and the following instructions. (1) Vehicle Major Exercise.  Depreserve equipment by removing only that material restricting exercise, Close all drains, remove blocks, and perform all before-operation checks. Couple semitrailer to towing vehicle, and drive for at least 25 mi (40 km), Make several right and left 90° turns. Make several hard braking stops without skidding. Do  the  following  during  exercising  when  it  is  convenient  and  safe:  operate  all  other  functional  components  and  perform all during- and after-operation checks. (2) Scheduled Services. Scheduled services will include inspection per subparagraph b above, and will be conducted in accordance with Table 4-3. Lubricate in accordance with instructions in Chapter 3, Section 1. (3) Corrective  Action.   Immediately  take  action  to  correct  shortcomings  and  deficiencies  noted. Record  inspection  and  exercise  results  on  DA  Form  2404.  Record  and  report  all  maintenance  actions  on DA Form 2407. After exercising, restore the preservation to the original condition. Replenish lubricants used during exercising, and note the amount on DA Form 2408. Table 4-3. Exercise Schedule Weeks 2 4 6 8 10 12 14 16 18 20 22 24 PMCS X X Scheduled  Services X X X X X Major Exercise X e.  Rotation.  Rotate  items  in  accordance  with  any  rotational  plan  that  will  keep  the  equipment  in  an operational condition and reduce the maintenance effort. 4-65.   PROCEDURES   FOR   COMMON   COMPONENTS   AND   MISCELLANEOUS   ITEMS. a. Tires. Visually inspect tires during each walkaround inspection. This inspection includes checking tires with a tire gage. Inflate, repair, or replace as necessary those found to be low, damaged, or excessively worn. Mark inflated and repaired tires with a crayon for checking at the next Inspection. b. Air Lines and Air Reservoir. Drain air lines and air reservoir of condensation, and leave draincock open. Attach a caution tag, annotated to provide for closing of draincock when the equipment is exercised. Place tags in a conspicuous   location. 4-113







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.