• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SLING    PROVISIONS    REPLACEMENT
LANDING   LEG   REPLACEMENT

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  136    137    138    139    140  141  142    143    144    145    146  
TM  9-2330-359-14&P 4-51.   SLING   PROVISIONS   REPLACEMENT   (Con’t). b . REPLACEMENT  (M872A1  AND  M872A2) NOTE Sling provision replacement for M872A1 and M872A2   is   the   same   except   placement   of screw may vary. 1. Remove  screw  (6)  and  slide  lift  eye  (7)  out  of siderail  (1). 2. Slide lift eye (7) into siderail (1) and install screw (6). c . REPLACEMENT   (M872A3) 1. Remove two cotter pins (8) and pin (9) from lift eye (7). Discard cotter pins. 2. Slide lift eye (7) out and remove from siderail (1). 3. Slide lift eye (7) in siderail (1) and install pin (9) and two new cotter pins (8). TA508060 4-96







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.