• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR   LINES   AND   FITTINGS   MAINTENANCE   (M872A3)   (Cont) - TM-9-2330-359-14P_126
AIR   LEAKAGE   TEST

TM-9-2330-359-14P Dolly Set Lift Transportable Shelter: M689 M832 M840 Manual
Page Navigation
  105    106    107    108    109  110  111    112    113    114    115  
TM  9-2330-359-14&P 4-36.   AIR   LINES   AND   FlTTINGS   MAINTENANCE   (M872A3)   (Con’t). 11. Install  two  bushings  (24)  on  airbrake  chambers. 12. Install two adapters (25), hose assemblies (26), and bushings (27) on tees (21). 13. Install  two  bushings  (27)  on  airbrake  chambers. 14. Install two adapters (15), hose assemblies (16), and bushings (17) on emergency relay valve (3). 15. Install  two  bushings  (17)  on  airbrake  chambers. 16. Install draincock (32) on air reservoir (1). Close draincock. FOLLOW-ON  TASKS: l Perform air leakage test (para 4-37). 4-65







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.