TM 55-8115-204-23&P
SECTION II. MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEM: CONTAINER, GENERAL CARGO
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
DS
GS
DEPOT
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
00
Container, Cargo
Inspect
0.3
Repair
3.0
1, 2
01
Door Assembly, Right
0.1
Service
0.1
Replace
2.0
1
Repair
1, 2
02
Door Assembly, Left
Inspect
0.1
Service
0.1
Replace
2.0
1
Repair
2.0
1, 2
03
Plywood Panels
Inspect
0.1
Replace
2.5
1
A
04
Joint, Panel
Inspect
0.1
Replace
0.75
1, 3
05
Gasket, Floor
Inspect
0.1
Replace
5.0
1
Repair
0.8
1
06
Floor Plank, Center
Inspect
0.1
Replace
6.0
1, 3
B
07
Floor Plank, Common
Inspect
0.1
and w/ Holes
Replace
4.0
1, 3
08
Floor Plank, Edge,
Inspect
0.1
LH and RH
Replace
4.0
1, 2
09
Cargo Container Walls
Inspect
0.1
Repair
3.0
1, 2
C
10
Tie-Down, Floor
Inspect
0.2
Replace
0.75
4
B-5