TM 5-4930-244-14
Section III. OPERATION UNDER USUAL CONDITIONS
2-7.
ASSEMBLY AND PREPARATION FOR USE.
(1)
No assembly or installation is required. Perform the "Initial Adjustments and Checks." Refer to paragraph
2-8 as well as Operator PMCS found in Table 2-1.
(2)
Preparation for use. (Refer to Figure 2-25).
NOTE
The following procedures apply to any of the four enclosure doors.
(a)
Open slam latches (1) on outside of door (2). Raise door up and fold.
(b)
Unlatch finger bolt latches (3) on inside of door (2). Let door hang freely.
CAUTION
·
Hold door securely when raising and lowering.
·
Keep fingers and hands away from hinges.
(c)
Raise door (2) up and attach hook (4) to ring (5) on top of enclosure (6).
Figure 2-25. Preparation For Use (Sheet 1 of 2)
(d)
Turn condensate removal valve handle (7) to "close" position on reel cabinet assembly (8).
(e)
Close ball valve (9) on air-receiver tank (10).
(f )
Close ball valve (11) on gear lube pump (12).
(g)
Close shut-off valve (13) on air-receiver tank (10).
2-26
