TM 5-3825-230-14&P
4-127. SHIPPING INSTRUCTIONS (CONT).
(5) To reduce the width of the unit for shipping the hydraulic motor and mount and motor guard can be removed
from the broom head for shipment. They are then stowed on the main frame as follows:
(a)
Remove hydraulic motor guard (1) (para 4-116).
(b)
Remove hydraulic motor and mount (2) (para 4-102).
(c)
Disconnect sprinkler hose (3) at spray bar (4).
(d)
Connect hydraulic motor and mount (2) to mainframe (5) using hardware removed.
(e)
Connect hydraulic motor guard (1) to opposite side of main frame (5) using hardware removed.
(f)
Secure sprinkler line (6) to hydraulic lines with cable ties (7) as required.
(g)
Wind vehicle connection harnesses (8 and 9) around posts (10) on main frame (11). Secure with cable ties
(7) as required.
(6)
Marking. Refer to AR 746 -80 for Marking of Supplies for Shipment.
b.
Army Shipping Documents. Prepare all Army shipping documents accompanying freight in accordance with
AR 725-5.
4-230